Hi everyone,
I want to buy a new server, and am contemplating a Dell R710 or the
newer R720. The R710 has the x5600 series CPU, while the R720 has the
newer E5-2600 series CPU.
At this point I'm dealing with a fairly small database of 8 to 9 GB.
The server will be dedicated to Postgres and a C++ based middle tier.
The longest operations right now is loading the item list (80,000 items)
and checking On Hand for an item. The item list does a sum for each
item to get OH. The database design is out of my control. The on_hand
lookup table currently has 3 million rows after 4 years of data.
My main question is: Will a E5-2660 perform faster than a X5690? I'm
leaning to clock speeds because I know doing the sum of those rows is
CPU intensive, but have not done extensive research to see if the newer
CPUs will outperform the x5690 per clock cycle. Overall the current CPU
is hardly busy (after 1 min) - load average: 0.81, 0.46, 0.30, with %
never exceeding 50%, but the speed increase is something I'm ready to
pay for if it will actually be noticeably faster.
I'm comparing the E5-2660 rather than the 2690 because of price.
For both servers I'd have at least 32GB Ram and 4 Hard Drives in raid 10.
Best regards,
Mark
Reply instructions:
You may reply publicly to this message via plain-text email
using any one of the following methods:
* Reply to all the recipients using the --to and --cc options:
reply via email
To: pgsql-performance@postgresql.org
Cc: lists@turnkey.bz
Subject: Re: hardware advice
In-Reply-To: <5064A4DC.5090304@turnkey.bz>
* Save the following mbox file, import it into your mail client,
and reply-to-all from there: mbox
This inbox is served by DDX for PostgreSQL; see mirroring instructions
for how to clone and mirror all data and code used for this inbox